联系我们

公司名称:XXX

电话:XXX

手机:XXX

联系人:XXX

地址:XXX

新闻动态
监控安装工程施工费用计算的5大方法
监控安装工程施工费用计算的5大方法
5 methods to monitor the construction cost calculation of installation engineering
一般来讲,安防工程商或者安防监控施工队,在监控安装工程过程中,如果包工不包料,施工费用是这样计算的,计算的5大方法归纳如下,抛砖引玉,方便大家沟通。
Generally speaking, security engineer or security monitoring construction team, in the process of monitoring and installation, if the Contractor does not package material, the construction cost is such calculation, the 5 main methods of calculation are summarized as follows, and it is convenient for everyone to communicate.
1.按天数计算。
1. according to the number of days.
按安防监控工程的工期,甲方每天固定给工程商或者施工队多少利润,双方事前通过合同或协议约定,然后在工程完工或逐日结算。
In accordance with the construction period of the security monitoring project, Party A is fixed to the contractor or the construction team on a daily basis. The two parties have agreed on the contract or agreement before the completion of the project, and then settle the project by day or day by day.
2.按点位计算。
2. according to the point position.
按照安防监控工程前端监控点位计算,也就是按监控摄像机的位置数量,乘以一个平均数,就是总的施工成本。有很多项目根据需要,在方案规划的时候就考虑被监控的区域是定点的摄像机还是带云台转动的?如高速球,红外高速球等等。
According to the front-end monitoring point calculation of the security monitoring project, that is, multiplying an average according to the location of the monitoring camera, that is the total construction cost. There are many projects that need to be considered. When planning the program, are the areas that are monitored are fixed cameras or cloud platforms? Such as high speed ball, infrared high speed ball and so on.
一般定点就安装半球或者枪式摄像机,动点都会安装云台解码器,镜头控制器,摄像机防护罩等等,或者会直接使用高速球来进行监控。因此,定点一般比动点的便宜。
General fixed-point installation of hemispherical or gun camera, the moving point will install the cloud platform decoder, lens controller, camera shield, and so on, or will directly use high speed ball to monitor. Therefore, the fixed-point is generally cheaper than the moving point.
3.按人工计算。
3. by manual calculation.
有些小的安防监控项目,不需要很多人来施工,施工过程又比较短,工期短,三五个工人就能完成整个工程项目,这种情况很多公司就直接通过给施工人员按人员结算日工资,月工资等等。
Some small security monitoring projects, do not need a lot of people to work, the construction process is relatively short, short time, 35 workers can complete the whole project, this situation a lot of companies directly through the workers to settle daily wages, monthly wages and so on.
4.按工程器材百分比计算。
4. according to the percentage of the engineering equipment.
安防行业有个约定俗成,很多公司在报监控方案的似乎还,会直接就按照总体产品成本,乘以一定的工程商利润比例,还有就是税金也是按工程器材总额来计算的。
There is a custom in the security industry, and many companies appear to be reporting monitoring programs, which will be directly proportional to the overall cost of the product, the proportion of the profit of a certain contractor, and the tax is also calculated according to the total amount of the engineering equipment.
5.按双方协议的价格计算。
5. the price is calculated according to the price agreed by the two parties.
甲乙双方,通过约定的其他价格协议计算
Party A and B calculate through other agreed price agreements.

联系方式

  1. 公司名称:XXX
  2. 电话:XXX
  3. 手机:XXX
  4. 联系人:XXX
  5. 地址:XXX

版权 © 天津市监控公司 网址:http://jiankongt.75ix.com  推荐:天津监控公司,天津监控安装,天津市监控安防

网站建设及优化保定遨游网络公司