监控安装工程施工费用计算的5大方法
一般来讲,安防工程商或者安防监控施工队,在监控安装工程过程中,如果包工不包料,施工费用是这样计算的,计算的5大方法归纳如下,抛砖引玉,方便大家沟通。
Generally speaking, in the process of monitoring installation engineering, if the contractor or contractor does not wrap materials, the cost of construction is calculated. The 5 methods of calculation are summarized as follows: to facilitate communication.
1.按天数计算。
1. according to the number of days.
按安防监控工程的工期,甲方每天固定给工程商或者施工队多少利润,双方事前通过合同或协议约定,然后在工程完工或逐日结算。
According to the duration of the security monitoring project, how much profit a party fixed to the engineering contractor or construction team every day can be agreed by the two parties in advance through the contract or agreement, and then the project is completed or settled day by day.
2.按点位计算。
2. according to the point position.
按照安防监控工程前端监控点位计算,也就是按监控摄像机的位置数量,乘以一个平均数,就是总的施工成本。有很多项目根据需要,在方案规划的时候就考虑被监控的区域是定点的摄像机还是带云台转动的?如高速球,红外高速球等等。
In accordance with the front monitoring point of the security monitoring project, the number of the monitoring cameras is multiplied by an average, which is the total construction cost. Many projects are required to consider whether the monitored area is a fixed-point camera or with a cloud platform when the program is planned. Such as high speed ball, infrared high speed ball and so on.
一般定点就安装半球或者枪式摄像机,动点都会安装云台解码器,镜头控制器,摄像机防护罩等等,或者会直接使用高速球来进行监控。因此,定点一般比动点的便宜。
General fixed-point installation of hemispherical or gun camera, mobile point will install PTZ decoder, lens controller, camera shield and so on, or will be directly monitored by high-speed ball. Therefore, the fixed-point is generally cheaper than the moving point.
3.按人工计算。
3. by manual calculation.
有些小的安防监控项目,不需要很多人来施工,施工过程又比较短,工期短,三五个工人就能完成整个工程项目,这种情况很多公司就直接通过给施工人员按人员结算日工资,月工资等等。
Some small security monitoring projects do not need many people to build, the construction process is relatively short, and the construction period is short. 35 workers can complete the entire project. In this case, a lot of companies pay directly to the construction staff according to the daily salary, monthly salary and so on.
4.按工程器材百分比计算。
4. according to the percentage of the engineering equipment.
安防行业有个约定俗成,很多公司在报监控方案的似乎还,会直接就按照总体产品成本,乘以一定的工程商利润比例,还有就是税金也是按工程器材总额来计算的。
The security industry has been established as a rule. Many companies seem to rely on the total product cost to multiply a certain proportion of the profits of the project, and the tax is also calculated according to the total amount of engineering equipment.
5.按双方协议的价格计算。
5. the price is calculated according to the price agreed by the two parties.
甲乙双方,通过约定的其他价格协议计算
Both Party A and B are calculated by other agreed price agreements